  • ADC Weekly Meeting [20180220]
    • INFN Status
      • Power restored on one line (1.4MW) - provides half the conditioned power. Other line ~month
      • Cabling for 2017 storage tender going on now
      • All ATLAS disk-only systems recovered - ready for production
      • ATLAS tape buffer already in production
        • Tape recovery by Oracle ~1 a day - few months
        • ATLAS RAW data already replicated
      • Farm services on CNAF (50 kHS06), 24 kHS06 in Bari
      • Installing WNs at CINECA next week
      • Start working on getting all services tested and online
    • Group Derivation Production
      • SharedWriter is being tested - at least one format has issues with metadata
      • MemoryMonitor issue still unresolved
      • Latest cache 21.2.16.0 built yesterday only for TAU group
      • 3.5PB marked for deletion very soon
      • Discussion of shares - current: GP_PHYS 10% (mostly data), GP_GROUP 3% only MC. Maybe go 50/50
    • MC Production
      • MC16d bulk production as complete as can be at this point (except INFN inputs)
      • Recovering from rucio issues still
      • Fed two more large MC16e simul to P1
      • Remainder of large BPHYS sample to come (several 100M) - could do as ES, clarify with PMG
      • Not much pile up running, some waiting on INFN inputs
      • List of user requests slowly going down
    • Reprocessing
      • First part of data17 reprocessing
        • Handful of jobs (~12) in period D and E needed to be obsoleted and retried (mainly merge steps)
      • [RUNNING] Period B 15+1 runs to fix alignment errors in first reprocessing pass (no fork after first event)
      • [RUNNING] Reprocessing of period F, H, I and K queued/started.
    • CRC/ADCoS Report
      • Running usual 250-300k slots
      • Had low number of jobs due to less MC
      • Issue with unacknowledged transfers in rucio for a period
      • Heavy Ion overlay jobs overloading CERN and Lyon frontiers
      • Discussion about CRC time spent on inefficient sites and investigation
      • Some T0 issues with CERN-PROD - being followed up
      • Still investigating issues with INFN-T1 transfer failures via RAL FTS
      • No CRC shifter for next 3 months - encourage signup
    • ATLAS Data Ocean Project
      • Industry R&D Collaboration with Google Cloud Platform
      • Integrate GCP with ADC
      • Allow ATLAS to explore different computing models for HL-LHC
      • Allow ATLAS user analysis to benfit from the Google infrastructure
      • Give Google real science use cases to improve their cloud platform
      • whitepaper: https://cds.cern.ch/record/2299146/files/ATL-SOFT-PUB-2017-002.pdf
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2018-02-20

Comments

Topic revision: r1 - 2018-02-20 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback