Tier1 and Tier-2 Weekly Report 2018-02-13

General News

  • ADC Technical Coordination Meeting [20180212]
    • Harvester Grid Status
    • Prefetcher
    • Update on rucio mover tests
  • ADC Weekly Meeting [20180213]
    • Group Derivation Production
      • AthDerivation,21.2.15.0 built yesterday
        • fixes serious problem with 21.2.14.0 - all jobs crashed when running over > 1 file in MCORE
        • Should have fixed problem with merging empty files
        • test tasks launched
        • Few % of jobs failed repeatedly in previous test tasks - resubmitted
      • Will send a new list of superseded derivations to be obsoleted/deleted this week (~ 1 PB)
    • MC Production
      • MC16d bulk samples mostly done end last week - cleanups, some INFN issues still
      • Increased to 20% share to finish up
      • Some work to ensure P1 stays full with sim tasks
      • More MC16e coming soon, starting from evgen
      • Still some issues due to ds name length for some tasks - discuss with AMI
    • Reprocessing
      • Remaining issues with first part of data17 being slowly treated - no issues from DQ
      • Speeding up testing for period B fix to aligmenent errors
      • Reprocessing of period F started - H,I,K setup
      • Running - 2017 5 + 13 TeV low mu data for jet/etmiss
      • Done - 2015 low-mu 13 TeV
    • CRC/ADCoS Report
      • Running 300k+ slots all week
      • Memory monitor issue - showing 100% CPU usage due to linker problem
        • Fix in future releases of pilot
      • libblas library added into HepOSlibs (needed by user analysis releases)
        • sites were asked to update their libs
      • Few minor issues with CERN-PROD datadisk and EOSATLAS deadlock
      • Slow transfers to BNL fixed with restart of gridftp doors
      • Timeouts to FZK tapes - limit of 100 connections
      • Ran out of ports at RAL ECHO - fix needs changes on central router (next week)
      • timeouts to TRIUMF DATATAPE - temporary overload - looks OK now
      • INFN transfers under investigation (firewalls? slow response from team)
    • Input data pre-production step
      • Proposal by Rod Walker
      • Motivated by high manual workload from lost or corrupted AODs and lost/missing/unavailable/bad checksum replicas
      • Aim: fix before tasks run
      • Detect failures by making disk replicas one produced with limited lifetime
        • Monitor and react to failures
      • Could be done for RAW (and maybe HITS)
        • Requires extra temporary disk space at T1's/nucleus?
        • Some tasks go longer than 30 days
        • How to avoid delays in starting next steps
        • Needs prodsys2 + rucio development
    • Blas and HEP_OSlibs updates
      • New requirement/dependency BLAS - inserted into HEP_OSlibs metarpm for SL6 and CentOS7
      • Was in VO ID card for a while:
      • Sites are required to upgrade to these versions
      • WLCG HEP_OSlibs baseline will be updated too
      • Experiment don't want to maintain OS dependencies in CVMFS
      • Solved eventuall by containers, which is where the focus is now
      • Hammercloud test thrown together quickly to check this:
    • Tape File Families
      • data18
        • data18_13TeV, data18_1beam, data18_1p8TeV, data18_900GeV, data18_calib, data18_comm, data18_cos, data18_hi
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2018-02-13

Comments

Topic revision: r1 - 2018-02-13 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback