Tier1 and Tier-2 Weekly Report 2017-10-24
General News
- ADC Technical Coordination Meeting
[20171023]
- Direct I/O tests - root, https, fax, rucio; local and remote
- Overview of various TCB projects (e.g. DDM, WFMS)
- ADC Weekly Meeting
[20171024]
- MC Production
- Usual ~250k+ slots being used all week, about half simul
- Most MC16a+c samples done
- Finally submitted 200/650M of the large BPHY sample for MC16a simul/reco. Simul is AF2 running mcore
- First large MC16e evgen submitted, ~84M so far (about 15%)
- Group Derivation Production
- Starting deletion of obsoleted data 1.4PB
- Built AthDerivation 21.2.4.0
- Will prepare a test DAOD production
- Regrouped trains according to format size and fraction to optimiz inputs per job - 96 formats, 18 trains
- Will use a similar config for the MC production
- Running up to ~60k job slots
- Reprocessing
- Done reprocessing 2017 toroid-ff runs with new 1-lines
- No progress on missing trigger info runs in physics_Background
- Prepping for fast reprocessing of data17
- Running test slices
- maybe use 2 files per job, no merge steps in slices
- CRC/ADCoS Report
- Quiet week
- TRIUMF-LCG2 tape endpoints: transfers failing with timeout errors, still under investigation (GGUS:131004, open)
- Issue identified in GGUS tickets where a link ending in parenthesis causes a broken link
- RFC Proxy and PaloAlto IPS Block (Asoka)
- Summarize long thread in Tier3 eGroup: http://cern.ch/go/6slf
affecting Stonybrook, UT Dallas, SMU and UVic
- Rucio failures if using RFC proxy but works with legacy proxy
- Traced to traffic being blocked by PaloAlto devices sitting on campus ITs due to work around for a GnuTLS library exploit
- No real security issue - likely caused by devices doing packet inspection. Fixed by Palo Alto content release 744 30454
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2017-10-24
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20171024
Topic revision: r1 - 2017-10-24 - LeslieGroer