TWiki
>
AtlasCanada Web
>
GridActivities
>
ATLASCanadaTier-2Operations
>
T2WeeklyReport20170801
(2017-08-01,
LeslieGroer
)
E
dit
A
ttach
Tier1 and Tier-2 Weekly Report 2017-08-01
Tier1 and Tier-2 Weekly Report 2017-08-01
General News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
APEL Synchronization Test Links
Production and Usage Status
Comments
General News
ADC Technical Coordination Meeting
[20170731]
Tape Usage - users' point of view
Event Service for Production on Grid - status update
ADC Weekly Meeting
[20170801]
MC Production
200-300k but big/long spikes are due to NERSC (HPC).
The global share itself looks fine.
Most of shares are being used for MC16 simulation and digit+reco.
EVNT jobs (single-core jobs) are almost zero but new requests to be submitted soon
~100 M events in the production queue: MC16a 15%, MC16c 25%, MC15 60%
Need more MC16a/c to keep the grid full
Have some MC16c requests but need to decide if will introduce a “merge step (10k events) for all the EVNT
Group Derivation Production
CP-trains launched (7 trains, 38 formats) - done
Physics trains launched (10 trains, 73 formats) - mostly done
Production with release 21 data17_13TeV essentially done
Investigasting a few failures in one task
Reprocessing
Waiting for a fix for 2017 data for missing trigger info in physics_Background
Done with processing of pPb
VdM
runs with updated alignment
Waiting on final 2 data runs with low-pt di-tau reconstruction
Reprocessing of Heavy Ion 2015-16 data in release 21 - WAITING
Will be a significant campaign, only test runs requested so far
Reprocessing on the full data set expected in autumn of 2017
Running few luminosity data2016 runs with 2017 configurations
Waiting on 2016 data reprocessing test with R20.7 and new ID alignment
CRC/ADCoS Report
300k+ cores used all last week
Frontier Issues
Overlay dataset reconstruction tasks defined and released Wednesday late afternoon
Caused usual havoc for Frontier servers at RAL,
TRIUMF
and
IN2P3
-CC - autorecovered
TRIUMF
, RAL needed a few restarts
No jobs went to CERN and those few in other clouds that have CERN as main Frontier server worked OK
Can see the effects on CPU efficiency for all tasks over the few days other than analysis and production, which needed condition data
Most of the affected tasks failed after wasting several days of walltime
Some pausing of tasks Friday and paused all yesterday
Now releasing the throttle very slowly (max 600 running jobs)
Installed newer FTS version at RAL as ran into 32-bit integer issue after 2B events
Pilot FTS at CERN had only RFC proxy installed that was not recognised by sites with older versions of dCache (<2.16)
Fixed temporarily by installing a legacy proxy in the FTS server but sites need to upgrade their m/w
Tickets issued to about a dozen sites about upgrading
CA Cloud Squad Actions
User DaTRI requests approved / processed (last week)
Open Issues and Ongoing Discussions
Availability & Reliability Reports [20170328]
2017 Reports - click down to find reports of format WLCG_All_Sites_ATLAS_MMMYYYY.(html|pdf)
Sites should be providing the 2016 storage pledge.
REBUS Site Capacities
REBUS Federation Resource Pledges
ATLAS Canada HammerCloud Tests
WLCG and General Computing News
Security News
gLite/EMI News
ROC_Canada News
Current shift
ABCD Determination and Monitoring
SSB Qualification and ABCD Determination Wiki
CA Cloud - Panda Resource Status
CA Cloud - Switcher Actions
CA Cloud - ABCD Determination
SSB Results
Critical tests for each site in the
Site Status dashBoard
are available at the links below
Australia-ATLAS
CA-MCGILL-CLUMEQ-T2
CA-SCINET-T2
CA-ALBERTA-WESTGRID-T2
CA-VICTORIA-WESTGRID-T2
SFU-LCG2
TRIUMF-LCG2
SAM Results (based on VO tests)
ATLAS Site Availability for last two weeks - CA Cloud
ROC_Canada
Australia_ATLAS
APEL Accounting
ACTION ITEM FOR SITES
: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
See example steps circulated by D. Qing (20100406)
account09.c
See
EGI Accounting Portal (Canada)
See
EGI Accounting Portal (Australia)
Links
[1]
http://wiki.hellasgrid.gr/wiki/bin/view/HellasGrid/GOC/MONToAPEL
[2]
http://goc.grid.sinica.edu.tw/gocwiki/glite-APEL
APEL Synchronization Test Links
TRIUMF-LCG2
Australia-ATLAS
CA-VICTORIA-WESTGRID-T2
CA-MCGILL-CLUMEQ-T2
CA-SCINET-T2
SFU-LCG2
Production and Usage Status
ADC Job Summaries Dashboard
Within the CA Cloud and Worldwide (
Panglia
View):
--
Leslie Groer - 2017-08-01
Comments
E
dit
|
A
ttach
|
Watch
|
P
rint version
|
H
istory
: r1
|
B
acklinks
|
R
aw View
|
Ra
w
edit
|
M
ore topic actions
Topic revision: r1 - 2017-08-01
-
LeslieGroer
AtlasCanada
Navigate ATLAS-Canada Wiki:
*
Home
* *
Activities
*
Analysis
Computing
Datasets
Getting Started
Grid Activities
*
Meetings
* *
People in ATLAS Canada
*
User Services
Travel To CERN
Wikis:
ATLAS
ATLAS Physics
Alberta
McGill
Montreal
SFU
Toronto
TRIUMF
UVic
ATLAS-Canada Institute Websites:
ATLAS-Canada
ATLAS Home
Alberta
UBC
Carleton
IPP
McGill
Montreal
SFU
Toronto
TRIUMF
UVic
York
Create New Topic
Search
Copyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback