Tier1 and Tier-2 Weekly Report 2017-04-04
General News
- ADC Tech Coord Meeting
[20170403]
- Discussion about dispatch datasets
- ADC Weekly Meeting
[20170404]
- MC Production
- No major issues. Running 100k-150k slots due to reprocessing
- 95% MC16, 5% MC15 eventhough global shares should be 1:1
- About 930M events in production queue (800M MC16, 130M MC15)
- Group Derivation Production
- Built 20.7.8.15 earlier this week (bug-fix)
- Use for full processing of data15+16 for one format
- Limited MC prod
- Built first rel 21 cache (21.0.19.1) for data
- Submitted trains on all 5 reprocessed runs for checking
- Fast merge enabled
- No MC production yet
- Reprocessing
- 58 runs submitted - all period A+L (20+24), period I (13) one period F
- About half are done
- Most DRAW reco and merges paused due to Frontier issues
- DESD file size is under examination now
- 1:1 merging workflow could be simplified to "cp"
- Pilot Update (68.2)
- Benchmarks - send dictionary to intermediary server before elastic search
- Standard payload cleanup - much simplified setup function
- Pilot uses info from job.release and job.homePackage to determine the asetup options
- Fixes for Event Service
- CRC/ADCoS Report
- Storage at some T1's and T2's filling up - rebalancing
- Jobs from later physics period have somewhat larger memory requirements than 2 GB/core - running only on HIMEM queues
- To get more slot some tasks were fixed at 2 GB/core - causing increased number of lost heartbeats at some sites
- Frontiers at IN2P3-CC and RAL under heavy load
- Many sites blacklisted because of these problems
- Many tasks paused to ease the situation, currently starting again
- Under investigation
- Reproducibility of MC production steps on the grid
- Knut Vadla
- Compare data produced at different sites and also INTEL vs AMD
- Use physics validation framework to investigate statistical variations
- Also do bit-wise comparisons
- Details in slides
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
-- %USERSIG{LeslieGroer - 2017-04-04%
Comments