Tier1 and Tier-2 Weekly Report 2016-11-22
General News
- ADC Technical Coordination Meeting
[20161121]
- ADC Weekly Meeting
[20161122]
- MC Production
- Contention with data reprocessing this week
- 360M events in queue, about 10 requests in approval step
- Still expect many MC15c requests for paper preparation
- Issues with current method of "boosting" nearly completed tasks (90% done) by giving them the highest priority of 900
- Interfering with real urgent tasks and about 40% of ~500 tasks have this priority set
- Some suggestions discussed: wait until 95% (or more done) before boosting and don't boost so high
- Meeting next week about MC16 workflow
- Requests for Titan being prepared
- Group Derivation Production
- Number of issues
- LAr error flags missing in 2015 data - full processing of data15 for all formats launched
- Muon TRT problem - full rerun of data15/16 for HIGGxDx, JETM3, SUSY2 and SUSY7 launched last week, EXOxx to be launched today
- There will need to be MC for these samples too
- PC decided not to go back and fix issue with silently skipped files
- Better isolation for photons and muons proposal needs an AODFix
- Ready to go in
- After validation, plan a full scale production over Xmas
- Test of fast merging - need new test as arguments were not being passed to the pmerge job (fixed)
- Reprocessing
- 2015/16 ALFA runs (25 total) rel 20.7.8.6
- physics_MinBias stream completed
- calibration stream being produced by splitting into 0.5M event chunks
- 2016 physics_BphysDelayed stream, 117 runs, rel 20.7.8.9
- Submitted last week, 77 done, 59 merged AOD datasets available
- Fixing a few issues along the way
- DESDM_ZMUMU/EGZ production for validation of release 21 alignment underway, 5 runs rel 21.0.8
- Release 21 validation
- Large ESD still biggest problem
- Memory leak (1MB/event) in ESDMerge halted 21.0.9 tasks for now - ticket open
- Looking into Run 1 crashes in same release
- CRC/ADCoS report
- Problems with access to data on tape last week
- Reprocessing of bphysdata running directly from tape endpoints without prestaging
- Tier0 staging at CERN for 2015/2016 rreprocessing campaign
- Users submitted large download requests using r2d2. Approval step needs to be added in r2d2 service.
- Users running analysis jobs with large amount of input on tape. A cap of 1 TB/day per user has been put temporarily.
- Low staging efficiency at CERN due to large backlog. Fixed by deletion of obsolete requests today.
- Additional action to decrease weight for selecting CERN as a source of data on tape.
- HC has been modified to use direct file specification and not ask rucio
- During configuration there was a period of HC tests failing on access to input files (Nov 17)
- Transfers to TAIWAN have been not running for >3 days.
- Sites with large numerof jobs in transferring state reported by ADCoSshifters,as well as some stuck files in export from Tier0 to Grid were all suffering from transfers to TAIWAN stopped
- Reported at WLCG meeting that CVMFS service at TAIWAN is unreliable. Concurred by other experiments. To be followed by WLCG.
- Pilot News (67.0) - release tomorrow?
- Verifying remaining proxy life time
- Currently every 5 minutes, req. minimum 10 minutes remaining
- NB. Switched off in case proxy verification is not used.
- Bug fix for nightlies in 'new' setup function
- Event service
- Setting 'pilot_killed' substatus error instead of 'pilot_failed' for kill signals
- Other AthenaMP fixes
- Updates to old site movers
- OS site mover correction - closing S3 connection
- GFAL2 site mover fix - Explicitly adding double slashes to "file:/" to avoid issues on one (CC7) site
- Updates to new site movers
- Several updates to new mv site mover, including creation of output.list, mv instead of copy, code cleanup
- Storm site mover using webdav etags instead of broken lcg-gt command
- Extended xrdcp stage-out error handling
- Now considering 'Unable to checksum' error (as well as 'query cksum is not supported') for sites that do not support CRC calculation on the fly
- Added gsiftp to the list of supported protocol schemes in lcgcp site mover
- CRC/ADCoS report
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
-- %USERSIG{LeslieGroer - 2016-11-22%
Comments