Tier1 and Tier-2 Weekly Report 2016-10-04
General News
- No ADC Technical Coordination Meeting this week
- ADC Weekly Meeting
[20161004]
- MC Production
- Grid full this week, but data reprocessing took fair amount of slots from Sep 29 (problem with pilot proxies on that day)
- Looking at ways to reduce disk space usage in production
- Current submitted (~54M) should be done soon - need to use some backfill to ensure keep grid busy
- Group Derivation Production
- AthenaMP validation has not revealed any show stoppers
- However, merging issues are resulting in 50% cpu/wall efficiency
- Playing with parameters. Latest test looks promising
- nFilesPerMergeJob=1, outputRatio=16, athenaMPMergeTargetSize = "DAOD *:0"
- Next cache to be built this week (20.7.7.9) - some important group updates
- Been looking at the sizes of each of the formats based on open-ended production for the post-machine development data - look at worst cases and see what can be done to reduce size
- Production picked up in the last couple of days (40k job slots)
- Reprocessing
- CRC/ADCoS report
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
-- %USERSIG{LeslieGroer - 2016-10-04%
Comments