TWiki
>
AtlasCanada Web
>
GridActivities
>
ATLASCanadaTier-2Operations
>
T2WeeklyReport20160503
(2016-05-03,
LeslieGroer
)
E
dit
A
ttach
Tier1 and Tier-2 Weekly Report 2016-05-03
Tier1 and Tier-2 Weekly Report 2016-05-03
General News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
APEL Synchronization Test Links
Production and Usage Status
Comments
General News
ADC and ATLAS Computing News [20160503]
ADC Weekly meeting
No ADC Technical Coordination Meeting this week
MC Production
Mostly sim and digi+reco this week
MC15c reprocessing about 85% done after 7 weeks (1-2%/day) (3.9B/4.5B done)
Failure rate 0.1-0.5% (35M events so far)
Pushing to make sure tasks don't land up with very long tails
Some investigation of using Event Index to identify duplicate events
Fairly manual intensive at the moment - hope to automate after characterizing
Derivations
Open-ended production on data16 with 20.7.5.4 continuing (8 runs so far)
mc15c - ramped up priority of CP samples
Jobs are about 3h length (0.8 input events/second) - would like to tune a bit
95% of jobs use 1.4 sec/event or less which implies 20k events for 8h job
Currently running with nGB per job = 10 (consistent with 20k if AOD size ~0.5Mb)
Still see outliers that would violate this though
HI Reprocessing
All
HardProbes
and
MinBias
submitted/running
All Express streams submitted yesterday
HI - UPC submitted,
MinBiasOverlays
coming
CRC/ADCoS report
200k slots used consistently last week
ATLAS-RAL-Frontier and ATLAS-T0-Frontier degraded
T1 DATADISKs filling up - BNL, SARA, INFN, FZK - being rebalanced
Transfer timeouts to BU - removed from list of nuclei
Some transfer issues between BNL and SARA and CERN - solved
Commissioning new HC Blacklisting
Rely on AGIS for information on topology and Panda resource status
Site definitions in
Start using for blacklisting
Check AGIS fields and blacklisting rules:
https://its.cern.ch/jira/secure/attachment/80851/20160317-AGIS-in-HammerCloud.v2.pdf
Slides describe the relevant AGIS parameters and HC tests and blacklisting criteria
Need to check hc_param, capability, type and is_default for sites
Need one "is_default" for production and one for analysis
Been tested with CERN, ND and DE clouds. Volunteered/told that can start with CA cloud
Updates for AFT/PFT templates presented next week
ADCoS Status
(plea for shifters)
Have not fully recovered from the drop of shifters during LS1
Three shift levels: Expert, Senior, Trainee
Daily shift period (CERN time): AP(0-8), EU(8-16), US(16-24)
Daily shift slots - Expert:1, Senior:3, Trainee:3
Shift duration: 9 hours for Expert, 8 hours for Senior/Trainee
Can be done remotely
Counted as Class 2 service in OTP
Over last few months, had about 1/2 coverage for Expert shifters - only 6 expert shifters
about 3/4 coverage for Senior shifts
18 Trainees, 6 finishing their training
DAST Status Review
8 shifters - 4 NA (incl. Yun-Ha) / 4 EU
Need management to prosletize for more volunteers
Computing Run Coordinator Shift Status
Onsite. 2/3 to 3/4 coverage. 14 actve shifters (4 most active do > 1/2 shifts)
ADC experts or experienced Cloud Support members
Worked on Live Page - global monitoring, updated daily
Improve tracking of long-standing issues
Got rid of white board, twiki seems better
Still some uncovered shifts
CA Cloud Squad Actions
User DaTRI requests approved / processed (last week)
Open Issues and Ongoing Discussions
Availability & Reliability Report [20160216]
January 2016 - All Sites Report ATLAS
Sites should be providing the 2015 storage pledge.
REBUS Site Capacities
REBUS Federation Resource Pledges
ATLAS Canada HammerCloud Tests
WLCG and General Computing News
Security News
gLite/EMI News
ROC_Canada News
Current shift
ABCD Determination and Monitoring
SSB Qualification and ABCD Determination Wiki
CA Cloud - Panda Resource Status
CA Cloud - Switcher Actions
CA Cloud - ABCD Determination
SSB Results
Critical tests for each site in the
Site Status dashBoard
are available at the links below
Australia-ATLAS
CA-MCGILL-CLUMEQ-T2
CA-SCINET-T2
CA-ALBERTA-WESTGRID-T2
CA-VICTORIA-WESTGRID-T2
SFU-LCG2
TRIUMF-LCG2
SAM Results (based on VO tests)
ATLAS Site Availability for last two weeks - CA Cloud
ROC_Canada
Australia_ATLAS
APEL Accounting
ACTION ITEM FOR SITES
: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
See example steps circulated by D. Qing (20100406)
account09.c
See
EGI Accounting Portal (Canada)
See
EGI Accounting Portal (Australia)
Links
[1]
http://wiki.hellasgrid.gr/wiki/bin/view/HellasGrid/GOC/MONToAPEL
[2]
http://goc.grid.sinica.edu.tw/gocwiki/glite-APEL
APEL Synchronization Test Links
TRIUMF-LCG2
Australia-ATLAS
CA-VICTORIA-WESTGRID-T2
CA-MCGILL-CLUMEQ-T2
CA-SCINET-T2
SFU-LCG2
Production and Usage Status
ADC Job Summaries Dashboard
Within the CA Cloud and Worldwide (
Panglia
View):
--
Leslie Groer - 2016-05-03
Comments
E
dit
|
A
ttach
|
Watch
|
P
rint version
|
H
istory
: r1
|
B
acklinks
|
R
aw View
|
Ra
w
edit
|
M
ore topic actions
Topic revision: r1 - 2016-05-03
-
LeslieGroer
AtlasCanada
Navigate ATLAS-Canada Wiki:
*
Home
* *
Activities
*
Analysis
Computing
Datasets
Getting Started
Grid Activities
*
Meetings
* *
People in ATLAS Canada
*
User Services
Travel To CERN
Wikis:
ATLAS
ATLAS Physics
Alberta
McGill
Montreal
SFU
Toronto
TRIUMF
UVic
ATLAS-Canada Institute Websites:
ATLAS-Canada
ATLAS Home
Alberta
UBC
Carleton
IPP
McGill
Montreal
SFU
Toronto
TRIUMF
UVic
York
Create New Topic
Search
Copyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback