All pp mode done in 20.7.3.9: physics_Main, physics_MinBias, express, CosmicCalo (DESDM/DAOD merges also to be done)
All 4 streams now running in the doHIP mode, with release 20.7.5.2 (AOD and HIST only)
2015 Heavy Ion (34 runs)
Following tests using express vs MinBiasOverlay, all 34 express stream runs now running in release 20.7.5.2 for beamspot derivation (AODs) and DQ sign off (HISTs)
CRC/ADCoS report
Running slots
Low number of jobs up to Saturday when MC15c was launched, grid running at 200k since then
Producing 50-70 Mevts per day (pile)
Efficiency of MC15c is low. Large number of failed jobs (about 40% yesterday). Being investigated
ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
See example steps circulated by D. Qing (20100406)