Tier1 and Tier-2 Weekly Report 2015-06-02

General News

  • ADC and ATLAS Computing News [20150602]
    • ADC Weekly meeting
    • Stable 13 TeV expected to start tomorrow
    • Rucio DaTRi replacement
      • Asked various people to test - not too many comments back and most implemented already
      • Users can create rules within their quota:
        • Datasets/containers can be selected based on patterns or lists
        • Storage endpoints can be selected by name or RSE expression
        • A summary page shows dataset sizes and RSE quotas
        • Warnings if the quota is exceeded or write permission denied
      • Currently under development:
        • Possibility to request a sample of a dataset/container
        • Approval system for over-quota requests
      • The system is in a pre-production state now and can be opened to more users
        • Caveat: TAPE endpoints currently excluded
    • Reprocessing
      • 2015 Cosmics Reprocessing
        • Full details can be found in the DATREP-12 JIRA ticket.
        • Inputs: 44 runs of physics_IDCosmic stream from early 2015
        • Output formats: merged-AOD, ESD, supermerged-HIST
        • Software release: 20.1.5.3(4)
        • Conditions tag: CONDBR2-BLKPA-2015-05; Geo-tag: ATLAS-R2-2015-03-01-00
        • AOD outputs are small and complete LBs
        • Slice tests (5 runs) submitted last Thursday in release 20.1.5.3
        • Full production submitted Saturday in release 20.1.5.4 (includes Tile update), one problematic run
          • 20/769 broken jobs, task is set to finished. JIRA: ATLASRECTS-2168
          • Campaign should be completed by end of today after some staging issues
      • New "exhausted" (sub-)state in JEDI seen in this production, works perfectly:
        • Delay in task going to finished allows decisions to be made without child steps being affected
        • Would be useful if reprocessing coords get a mail when a task goes to this state
        • Some discussion if "exhausted" can be given to DEFT from JEDI to display somehow in prodtask-dev.cern.ch (as well as / instead of "running")?
      • Started to do run 1 slice tests in release 20.1.5.X, beginning with 2010 and debugging problems
    • Derivation Production
    • CRC Report
      • Beam expected to start tomorrow
      • Detector commissioning mostly done, all magnets on since last week
      • Trigger menu for week 1 validated and HLT algorithms validated
      • ADC reprocessing of tile slice test from May 28 started in bulk May 30
        • ~80% done; first "exhausted" tasks seen
      • New record for Rucio transfers - 2.5-3PB per day (good week for Run 1 was 6PB/week)
      • Prodsys2 doing its jobs: HLT, T0 processing, Event Index being tested
      • Bunch spacing meta-info (+ campaigns, sub-campaigns) have been agreed between AMI, Rucio, MC, GP and ProdSys2
        • Ready for the implementation (waiting confirmation from AMI)
      • No major issues from the week
    • New SONAR for Run 2
    • Managing MultiCloud Processing
      • Reminder: Multi Cloud Processing mechanism (MCP) allows resources from sites in one cloud to get jobs from tasks running in another cloud.
      • Important point is that the job output is returned back to the Tier1 of the cloud where the task belongs
      • Ideal case would have MCP turned on for all sites - allow anyone to pick up workload that has availability
      • Reality is moving data across cloud boundaries can cause issues
        • The increase of transfer load sometimes does not compensate the distribution of the load
        • Rucio transfers with higher priority or importance may get stuck
          • This may be mitigated by introducing shares.
          • Have seen times where one cloud "steals" load from other clouds and regional resources get unused, or what is worse, regional resources start getting jobs from another clouds via MCP
      • Testing PanDA metric to balance MCP load:
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2015-06-02

Comments

Topic revision: r1 - 2015-06-02 - LeslieGroer
 