Tier1 and Tier-2 Weekly Report 2014-08-26

General News

  • ADC and ATLAS Computing News [20140826]
    • ADC Weekly meeting
    • ProdSys2 - MC Production
      • Issue found in missing parameter for pileup - fixed, needs testing
      • Need to add capability to produce subset of ESD, RDO
      • Need a fix for tags with tow transforms for Fast Sim and FTK
      • Sample A test submitted but digi+reco had issues with output; resubmit
      • Would like shifters to help monitor tasks, open tickets, etc
    • Data Reprocessing
    • AMOD/ADCoS Report
      • Had a reduction of production jobs on grid (down to 40k) but recovered
      • Some deletion service issues
      • Full tokens (T1 SCRATCHDISK)
    • DAST:
      • Relatively smooth transition to JEDI for user analysis
      • Question on controlling the retries - users request to have more control in case of failures, broken sites, etc.
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2014-08-26

Comments

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2014-08-26 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback