Tier1 and Tier-2 Weekly Report 2014-08-05

General News

  • ADC and ATLAS Computing News [20140805]
    • ADC Weekly meeting
    • Rucio Commissioning
      • Reported issues last week with PandDA lookup delays - timeouts when PanDA tries to resolve many (thousands) of files in Rucio file catalog
        • Rucio team made some query and cache optimizations
        • PanDA servers updated to latest Rucio clients
        • More servers added to Rucio production server pool
        • The timeouts errors were not reported anymore
      • Last Saturday grid started to drain
        • Almost no simul jobs, but only pileup
        • Jobs were not brokered because of slow resolving of big bulks of files having replicas on many sites
        • On Monday Tadashi changed brokering algorithm to put less pressure on Rucio
        • The reason of slow response is not fully understood (DB load is OK, CPU load on Rucio servers is only slightly higher than usual)
        • The issue will be followed up further with Rucio devs
      • Rucio - PanDA Integration
        • PanDA developers are in process of validating latest (2.6.0) DQ2 client
          • Many things changed inside DQ2 client to support Rucio as a backend
        • Issues reported to Rucio during the validation are under investigation of Rucio devs
        • Plan to ask HC to use the latest DQ2 client (and register part of the produced output datasets) when these issues are resolved and DQ2 client validated by PanDA team
    • MC Production
      • (last month): 513M events (111M in past week, 16M/day)
      • (last month): 999M events (127M in past week, ave 18M/day)
      • Rate has been reduced in past two weeks, mainly due to Rucio issues
      • About 150M events full sim (55M mcore), 175M reco in system to be processed, 140M full sim/230M AFII to be submitted
      • DC-14 status
        • Digi+Reco 8TeV: Most of the Release 19.0.X full campaign is finished (360M in single core)
        • Simulation 13TeV: New geometry and using mcore
          • 190M out of 380M finished, lots of the remaining launch yesterday
        • Digi+Reco 13TeV: Release 19.1.X built but not yet validated. First validation tests showed a memory leak (being discussed now) that will be fixed fast and new cache built.
          • mcore not yet validated and needed for production: also in discussion now
      • May need an increase of mcore resources as early as next week (380M to do, don't know rate yet)
      • Sim@P1 available from 15August (2.1k jobs slots)
    • Reprocessing
      • DC-14 full express stream: reconstruction and HIST merging done; replicated to CERN. ESD/AOD merging ongoing, problems with memory usage and preservation of lumiblock boundaries
        • Require 500TB for xAOD and ESD - no replication policy defined yet for xAOD (still labelled AOD in dataset name)
      • 2010 HI peripheral events: output merged NTUP. Problems with skimming blocking jobs and whole tasks (if the 10 scout jobs fail)
      • 2012 DRAW_ZEE: test with one run done, waiting for feedback from egamma
      • Bulk reprocessing - hope to start end of this week
    • JEDI
      • Agreed to switch user analysis to JEDI Aug 12 16:00 CET
      • Will be announced by email
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2014-08-05

Comments

Topic revision: r1 - 2014-08-05 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback