TWiki
>
AtlasCanada Web
>
GridActivities
>
ATLASCanadaTier-2Operations
>
T2WeeklyReport20140715
(2014-07-15,
LeslieGroer
)
E
dit
A
ttach
Tier1 and Tier-2 Weekly Report 2014-07-15
Tier1 and Tier-2 Weekly Report 2014-07-15
General News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
APEL Synchronization Test Links
Production and Usage Status
Comments
General News
ADC and ATLAS Computing News [20140715]
ADC Weekly meeting
Rucio migration
Started testing 1M files/day last week - uncovered some issues
FTS prod and pilot share same DB - ask to separate these
Keeping up with deletions from all the tests combined with other catch-up data deletions caused T1 overload
A bottleneck in the polling of FTS jobs has been identified and being fixed
Decrease back to 100k files/day for the meantime
Start testing some T2's as well in chain
Test more sites with deletions through https
DDM and
PanDA
discussions on integrating Rucio
New testing rucio-aware DQ2 client (rc6) being released this week
Start validating
ProdSys2
- Validation and Testing
evgen: running for most use cases
sim: container with more than one dataset will be addressed by automated registering (secondaries) the evgen datasets in the clouds
merging and pileup: working but need more testing
post-production: work being done on retries
fix tasks not starting until previous task is finished
Group productions - about half way through validations (event by event comparisons)
Part of express stream reprocessing is running on
ProdSys2
Deletion Service status
Some file deletions affected by gfal library bug in migration from LFC to Rucio (lacking Scope) - caused massive slowdown
Regular transient data cleanup was not running since April till June (usually runs monthly)
Catmore policy (cleanup of data untouched for 6 months) was re-applied again in July
Huge backlog being worked through now - added two more nodes (5 total) - expect a week to catch up?
e.g. BNL, RAL - ~90k datasets,
TRIUMF
45k
MWT2 reports 6 million dark files, 120TB
Rucio dumps are now available, we need to have a dark data check on all the sites.
MC Production
Run 1: DC14 8TeV digi+reco submitted last week - 450M events, single core, half-way done (20M / day)
round of 19.0.3.X validation ongoing in parallel to production, including multicore validation (sign off today?)
Run 2: DC14 13TeV submitted last week - 275M events, mcore, 5M/day (hope for 7/8M/day)
digi+reco: still to be validated - 19.1.1 to be built this week - tight schedule as need to start in September
DC14 utilizing a fair fraction of compute resources now
Expect 150-200M events/week (sim+digi/reco)
+ AODs, correspond to around 180-220 TB per week, or 0.7-0.9 PB/month (includes merged HITS and AODS)
ADC Shifts
Merge ADCOS +
Comp@P1
shifts
ADCoS
very busy already
Setting up checklists now and organizing tasks
More monitoring tools and automation for some of the tasks (ease shift summaries etc)
CA Cloud Squad Actions
User DaTRI requests approved / processed (last week)
Open Issues and Ongoing Discussions
Sites should be providing the 2014 storage pledge.
REBUS Site Capacities
REBUS Federation Resource Pledges
ATLAS Canada HammerCloud Tests
WLCG and General Computing News
Security News
gLite/EMI News
ROC_Canada News
Current shift
ABCD Determination and Monitoring
SSB Qualification and ABCD Determination Wiki
CA Cloud - Panda Resource Status
CA Cloud - Switcher Actions
CA Cloud - ABCD Determination
SSB Results
Critical tests for each site in the
Site Status dashBoard
are available at the links below
Australia-ATLAS
CA-MCGILL-CLUMEQ-T2
CA-SCINET-T2
CA-ALBERTA-WESTGRID-T2
CA-VICTORIA-WESTGRID-T2
SFU-LCG2
TRIUMF-LCG2
SAM Results (based on VO tests)
ROC_Canada
Australia_ATLAS
APEL Accounting
ACTION ITEM FOR SITES
: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
See example steps circulated by D. Qing (20100406)
account09.c
See
EGI Accounting Portal (Canada)
See
EGI Accounting Portal (Australia)
Links
[1]
http://wiki.hellasgrid.gr/wiki/bin/view/HellasGrid/GOC/MONToAPEL
[2]
http://goc.grid.sinica.edu.tw/gocwiki/glite-APEL
APEL Synchronization Test Links
TRIUMF-LCG2
Australia-ATLAS
CA-VICTORIA-WESTGRID-T2
CA-MCGILL-CLUMEQ-T2
CA-SCINET-T2
SFU-LCG2
Production and Usage Status
ADC Job Summaries Dashboard
Within the CA Cloud and Worldwide (
Panglia
View):
--
Leslie Groer - 2014-07-15
Comments
E
dit
|
A
ttach
|
Watch
|
P
rint version
|
H
istory
: r1
|
B
acklinks
|
R
aw View
|
Ra
w
edit
|
M
ore topic actions
Topic revision: r1 - 2014-07-15
-
LeslieGroer
AtlasCanada
Navigate ATLAS-Canada Wiki:
*
Home
* *
Activities
*
Analysis
Computing
Datasets
Getting Started
Grid Activities
*
Meetings
* *
People in ATLAS Canada
*
User Services
Travel To CERN
Wikis:
ATLAS
ATLAS Physics
Alberta
McGill
Montreal
SFU
Toronto
TRIUMF
UVic
ATLAS-Canada Institute Websites:
ATLAS-Canada
ATLAS Home
Alberta
UBC
Carleton
IPP
McGill
Montreal
SFU
Toronto
TRIUMF
UVic
York
Create New Topic
Search
Copyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback