Tier1 and Tier-2 Weekly Report 2014-02-11
General News
- ADC and ATLAS Computing News [20140211]
- SAM VO:ATLAS AVAILABILITY
-
-
- ADC Weekly meeting
- HC tests with JEDI
- Testing at 4 sites (CERN, BNL, LRZ, DESY)
- simple ROOT job accessing SMWZ_NTUP with 1 job/task
- Fixed various issues along the way (LFC lookups, not using local replicas)
- Ready to expand the testing to more sites
- Used ganga so far, need real users for prun/pathena
- Start with some powerusers so direct control and interaction with Tadashi
- SSB Automation
- ABCD - measure site availability for ATLAS user analysis
- Being done manually once per month
- Develop metrics: 10101 (PandaResouce Status), 10100 (Switcher Actions), new 10102 (combine Panda Resource status - in testing)
- ALL_period = GOOD_period + BAD_period + NULL_period (in last 30 days)
- ratio = GOOD_period / (ALL_period - NULL_period
- If test period (20 min) get 60 min grace period
- Few corner cases to be checked and coded (e.g. grace periods when have scheduled and unscheduled downtimes back-to-back)
- T1: A>90, C 80-90, D<80
- T2: A(T2D)>90, B(T2)>90, C 80-90, D<80
- T2D Status
- metric 10097: http://dashb-atlas-ssb.cern.ch/dashboard/request.py/siteviewhistory?columnid=10097
- Introduce T2D candidate
- change threshhold 5MB/s to 4MB/s
- transfer speed in both directions: was average, now look at minimum for both
- remove T1s and T3s from the view
- (To do) produce metric T2D candidates for medium files
- Solve issue with transfers to NIKHEF T1
- After that change soft criteria of < 3 Bad to strict criteria > 9 Good
- Q: Are there T3's that should be in this (Chile)
- Q: Old metrics will be in SSB still? A: Use only new metric as incorporates old
- Panda Pilot Update (58i)
- Improved error handling for failed replica lookups using DQ2 functioons
- Increase pilot TCP message buffer from 2kB to 4kB
- Use /afs releases correctly with no cmtconfig in path
- Fix parsing of /ruciotest for SURLs
- AOB
- FR sites having issues with build jobs spawning too many processes on 24 and 32 core systems. Limit memory use per job and not per process (as seems to be done at TRIUMF). Make flags can limit this but not scalable solution.
- CA Cloud Squad Actions [20120626]
-
- other cloud squad related savannah and / or ROC ggus tickets [20110705]
- panda monitor for PD2P activity within clouds (default view (last 7 days) units = datasets)
- Open Issues and Ongoing Discussions
- Sites should be providing the 2013 storage pledge.
- HammerCloud [20120214]
- gLite/EMI News [20121127]
- ROC_Canada News [20130625]
- Current shift - Erming Pei June 24-28, 2013
- Next Week - Leslie Groer
- WLCG and General Computing News [20120911]
SSB Results
- Critical tests for each site in the Site Status dashBoard are available at the links below
SSB PanDA Test Queue Availability (month)
- this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (
T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).
SAM Results
- site service status via Gridview
- Please check your site
- April 2012 Detailed Site Information (valid until 20120430):
- TRIUMF-LCG2
- Australia-ATLAS
- CA-ALBERTA-WESTGRID-T2
- CA-SCINET-T2
- CA-VICTORIA-WESTGRID-T2
- SFU-LCG2
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Publishing Status
APEL Accounting Results
APEL Synchronization Test Links
Site Reports
Alberta
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Victoria
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Toronto
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
McGill
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Australia-ATLAS
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Production
Summary
- NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.
- Within the CA Cloud and Worldwide ( Panglia
View):
--
Leslie Groer - 2014-02-11
Comments