Tier1 and Tier-2 Weekly Report 2013-02-05
General News
- ADC and ATLAS Computing News [20130205]
- ADC Weekly meeting
- LHC running: p-Pb 18.3 nb^-1 collected. Pb-p ongoing (2.5 nb^-1 collected, goal 30nb^-1). Still hope to collect pp 2.76TeV before end of run Feb 11.
- New DQ2/Rucio client
- Deployment of new Rucio clients with Python2.6 have been ready for a while, but postponed so as not to cause disruption
- Available in CVMFS (DQ2 clients and Py26 libraries)
- Tested prod+ana at a few EGI sites with test pilots
- Minor modification of the pilot wrapper was needed in APF1
- Some sites moved to Rucio clients in production
- Still some site dependent issues to resolve for OSG
- Discussions ongoing with APF2 and pilot developers
- Propose to move all CVMFS EMI sites to use the new Rucio clients
- Do not change the CVMFS link, but proceed on site-by-site basis changing APF config.
- Do one cloud at a time, start with UK?
- AMOD Report
- Thursday afternoon: huge increase in “holding” jobs. Cause not understood, problem disappeared by itself.
- From SLS plots it seems that DQ2 registration was slow
- Storage Area Automatic Blacklisting
- CA Cloud Squad Actions [20120626]
-
- other cloud squad related savannah and / or ROC ggus tickets [20110705]
- panda monitor for PD2P activity within clouds (default view (last 7 days) units = datasets)
- Open Issues and Ongoing Discussions
- Sites should be providing the April 2012 storage pledge.
- HammerCloud [20120214]
- gLite/EMI News [20121127]
- ROC_Canada News [20121030]
- Current shift - Neil Knecht November 5-9, 2012
- Next Week - Simon Nderitu
- WLCG and General Computing News [20120911]
SSB Results
- Critical tests for each site in the Site Status dashBoard are available at the links below
SSB PanDA Test Queue Availability (month)
- this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (
T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).
SAM Results
- site service status via Gridview
- Please check your site
- April 2012 Detailed Site Information (valid until 20120430):
- TRIUMF-LCG2
- Australia-ATLAS
- CA-ALBERTA-WESTGRID-T2
- CA-SCINET-T2
- CA-VICTORIA-WESTGRID-T2
- SFU-LCG2
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Publishing Status
APEL Accounting Results
APEL Synchronization Test Links
Site Reports
Alberta
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Victoria
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Toronto
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
McGill
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Australia-ATLAS
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Production
Summary
- NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.
- Within the CA Cloud and Worldwide (Panglia
View):
--
LeslieGroer - 2013-02-05