Tier1 and Tier-2 Weekly Report 2011-07-05

General News

  • ADC and ATLAS Computing News [20110704]
    • ADC Weekly meeting
    • WLCG-DESY meeting going on next week (July 11-13) https://indico.desy.de/conferenceTimeTable.py?confId=4019#20110711
    • Try to increase PD2P placement of data at Tier-2's this summer (ovecome the dearth of data at T2's)
      • Several ideas (extra copy using fairshare whenever a T2 copy occurs; or when a T1 copy occurs; make 2 preplaced fairshare copies at T2 of all group produced NTUPLEs; use DQ2 "closeness" along with brokerage to improve subscription performance)
      • Approved by CREM last week and implement in a few days. Evaluate the results in 2 months
      • Expect a lot more copies - at least 2-4 times more data at T2's
    • Squid Cache for Generator job options - prevent flooding of CERN services (DOS) getting MCopts.tar.gz
      • Detect site squid cache(s) (e.g. frontier caches). Define ATLAS_PROXIES, but respect http_proxy settings in job transform
      • May be security settings issues if securing squid caches based on destination rather than source
      • Check this with
   $ export http_proxy=my.cache:3128
   $ wget http://atlas-computing.web.cern.ch/atlas-computing/links/kitsDirectory/EvgenJobOpts/MC11JobOpts-00-00-19.tar.gz
      • Implement in pilots eventually?
    • Couple of incidents of users issuing huge numbers of dq2-get requests (47k in one day from a big T1)
      • For now sites should report these "abuses" to AMOD if this is seen and they will follow up with user (contact, then blacklist if necessary)
      • Longer term - implement some limitation on dq2_get.
      • Some recipe needed for T3's without grid storage (no FTS) - encouraged to provide srm storage and be included in ToA.
    • Some issues with FTS channels being stuck caused some sites to not get the latest DBRelease file and ANA queues were set brokeroff at 4 T1's and some T2's
      • Implement new policy for "DBReleases latest" where if more than 90% of sites and all online T1's have the new DBRelease then this new version will be used by all analysis jobs
        • Shifters need to be able to track which release is meant to the "latest"
      • Release 17 in validation (17.0.1.2) and deriving conditions data for runs up to the technical stop
        • Build 17.0.2.1 this week. Deadline for conditions data July 11.
        • Start processing initial express and CosmicCalo streams July 14? - derive final conditions
        • Release 17 on Tier-0 ~ August 1. Bulk production about 2 weeks later.
          • Some experts away on vacation so schedule is optimistic!
      • Florentin Bufor (Wisconsin) taking over SLS monitoring for Squid/Frontier
        • Create SSB views
        • Some errors for TRIUMF and KIT being fixed now

  • CA Cloud Squad Actions [20110628]
    • DaTRI requests approved / processed (last week)
SITE NumRequests NumDatasets NumSubscribed SizeofAllDatasets (GB)
AUSTRALIA-ATLAS_SCRATCHDISK 2 246 246 461
CA-SCINET-T2_LOCALGROUPDISK 1 1 1 11
CA-VICTORIA-WESTGRID-T2_LOCALGROUPDISK 0 0 0 0
CA-VICTORIA-WESTGRID-T2_PHYS_EXOTICS 0 0 0 0
SFU-LCG2_LOCALGROUPDISK 9 132 132 5946
TRIUMF-LCG2_LOCALGROUPDISK 13 32 32 406
TRIUMF-LCG2_SCRATCHDISK 0 0 0 0
TRIUMF-LCG2_PERF-TAU 1 57 57 840

NOTE: Lot's of failures for subscriptions to user.cloh.RPVLL2011

    • Declared Downtimes
      • CA-ALBERTA-WESTGRID-T2/SCHEDULED downtime (OUTAGE) [06-07-2011 15:00 to 06-07-2011 23:00 UTC ] - dCache Upgrade from 1.9.3 to 1.9.5
    • ATLAS Site Exclusion Savannah entries [20110621]
      • HammerCloud autoexclusions
        • None
    • other cloud squad related savannah and / or ROC ggus tickets [20110705]

pd2p_20110705.png

  • Security News [20110621]
    • [20110524] UVic and Toronto participated in SSC5 (23 May - 03 June 2011) - final reports to be sent to SSC5
    • [20110616] EGI CSIRT ADVISORY [EGI-ADV-20110615-02] Vulnerability for LRMS (details to be posted later)

  • gLite News [20110705]
    • [20110705] [https://operations-portal.egi.eu/broadcast/archive/id/420][EGI Trust Anchor release 1.40-1] is now final - please install.
    • [20110504] [https://operations-portal.egi.eu/broadcast/archive/id/378 ][gLite 3.2 WN release] has an important known issue detailed here: http://glite.cern.ch/glite-WN/known_issues
    • [20110627] New IGTF distribution (certificates) and version 3 of the CRL retrieval tool Fetch-crl https://dist.eugridpma.info/distribution/util/fetch-crl3/. Version 1.39 was updated to 1.40 on 2011-06-28.
    • [20110628] [https://operations-portal.egi.eu/broadcast/archive/id/410][gLite 3.2 update 30 release] The highlights of the update are:
      • New version of glite-BDII_top
      • New version of glite-CREAM (to support changes for SGE)
      • New version of glite-LB
      • New version of glite-SGE_utils

  • ROC_Canada News [20110621]

  • General Computing News

SAM Results

  • site service status via Gridview - Please check your site

  • June 29-July 5, 2011
sam_au_20110705.png
sam_alberta_20110705.png
sam_mcgill_20110705.png
sam_mcgill_pps_20110705.png
sam_scinet_20110705.png
sam_sfu_20110705.png
sam_uvic_20110705.png
sam_triumf_20110705.png

APEL Accounting

APEL Publishing Status

apel_status_au_20110705.png
apel_status_ca_20110705.png

APEL Accounting Results

apel_report_au_20110705.png
apel_report_ca_20110705.png

APEL Synchronization Test Links

Site Reports

Alberta

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • See "Notes" section below

Outstanding Issues

SFU

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • See "Notes" section below

Outstanding Issues

Victoria

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • see "Notes" section below

Outstanding Issues

Toronto

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • See "Notes" section below

Outstanding Issues

McGill

Recent Issues

Outstanding Issues

TRIUMF

Recent Issues

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • see "Notes" section below

Outstanding Issues

Australia-ATLAS

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • See "Notes" section below

Outstanding Issues

Production

panglia_world_prod_20110705.pngpanglia_world_ana_20110705.png
panglia_ca_prod_20110705.pngpanglia_ca_ana_20110705.png

Summary

  • NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.

  • Within the CA Cloud and Worldwide (Panglia View):


World-wide weekly ATLAS ADCoS summary (Jun.28-Jul.4,2011)
________________________________________________________________________

I. General summary:
   ---------------

A)  During the past week (Jun.28-Jul.4,2011) Panda production service
   - completed 1,554,865 managed group, MC production, validation
     and reprocessing jobs
   - average ~221,124 jobs per day
   - failed 88,607 jobs
   - average efficiency:
      -- jobs     ~94.6%
   - active tasks from Panda-monitor: 1,476
      -- distribution by cloud:
CA:33 CERN:77 DE:186 ES:41 FR:133 IT:25 ND:28 NL:168 TW:11 UK:164 US:610 

B) - CERN/CERN-PROD downtime (SE,SRM OUTAGE:CASTORATLAS),Jun.29,Jul.4. 

II. Site and FT/DDM related interruptions/issues/news (+fixed, -not yet)
    -------------------------------------------------

3) Thu Jun.30 
+ CERN/DBRelease.v150700 subscriptions got stuck since Jun.21.Elog 26932,
  experts informed.Seems fixed. 

III. ATLAS Validation,Repro,DDM,ADC Operation Savannah bug-reports
    (++ bug understood/fixed, -+ fixed in part, -- not fixed yet)
----------------------------------------------------------------------

-+ 15.6.14.3 mc10_7TeV evgen task 434243 failures: ATH_FAILURE - Athena
 non-zero exit.Error: Can't find tan beta in BLOCK MINPAR or BLOCK EXTPAR.
 Savannah 83699,83769.MC10 production-SUSY.All jobs failed 9 attempts each
 at different sites in CA cloud.The same problem with t.434191,434215 in
 NL cloud.Tasks are in "failed"/ABORTED state.Config issue.


</verbatim>

-- LeslieGroer - 2011-07-05
Topic attachments
I Attachment History Action Size Date Who Comment
PNGpng apel_report_au_20110705.png r1 manage 49.8 K 2011-07-05 - 18:01 LeslieGroer  
PNGpng apel_report_ca_20110705.png r1 manage 95.0 K 2011-07-05 - 18:01 LeslieGroer  
PNGpng apel_status_au_20110705.png r1 manage 11.1 K 2011-07-05 - 18:01 LeslieGroer  
PNGpng apel_status_ca_20110705.png r1 manage 22.3 K 2011-07-05 - 18:01 LeslieGroer  
PNGpng panglia_ca_ana_20110705.png r1 manage 46.0 K 2011-07-05 - 18:01 LeslieGroer  
PNGpng panglia_ca_prod_20110705.png r1 manage 39.3 K 2011-07-05 - 18:01 LeslieGroer  
PNGpng panglia_world_ana_20110705.png r1 manage 49.2 K 2011-07-05 - 18:01 LeslieGroer  
PNGpng panglia_world_prod_20110705.png r1 manage 46.9 K 2011-07-05 - 18:01 LeslieGroer  
PNGpng pd2p_20110705.png r1 manage 29.5 K 2011-07-05 - 18:02 LeslieGroer  
PNGpng sam_alberta_20110705.png r1 manage 7.3 K 2011-07-05 - 18:02 LeslieGroer  
PNGpng sam_au_20110705.png r1 manage 7.1 K 2011-07-05 - 18:02 LeslieGroer  
PNGpng sam_mcgill_20110705.png r1 manage 7.3 K 2011-07-05 - 18:02 LeslieGroer  
PNGpng sam_mcgill_pps_20110705.png r1 manage 7.3 K 2011-07-05 - 18:02 LeslieGroer  
PNGpng sam_scinet_20110705.png r1 manage 7.2 K 2011-07-05 - 18:02 LeslieGroer  
PNGpng sam_sfu_20110705.png r1 manage 7.1 K 2011-07-05 - 18:02 LeslieGroer  
PNGpng sam_triumf_20110705.png r1 manage 7.1 K 2011-07-05 - 18:02 LeslieGroer  
PNGpng sam_uvic_20110705.png r1 manage 7.2 K 2011-07-05 - 18:02 LeslieGroer  
Topic revision: r1 - 2011-07-05 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback