- ADC and ATLAS Computing News [20110321]
- ADC Weekly http://indico.cern.ch/conferenceDisplay.py?confId=131784
[20110321]
- Request to T1's to implement FTS channels discussed at T1SCM
- Create a "cloud" T1S containing all the T1s+CERN
- Create a "cloud" T2DS containing all the T2s in the list
(3:IT, 4:UK, 3:FR, 4:DE, 3:ES, 5:US)
- Expect the list to stay stable for 3 months
- Implement multi-hop transfers in DDM rather than in DaTRI
- HI reprocessing (250TB, 44 runs, 85% done, merging underway) - awaiting validation of first run before starting derived dataset replication
-
- Muon reprocessing ready for validation (0.2 PB) and started at some sites (note to T1's: one reco job per file)
- CERN LSF overwhelmed by single non-ATLAS user submitting 180k jobs
- CERN deletion too slow (1 Hz) due to new SRM - fixed
- Slow AFS response believed to be due to a single server - fixed
- Tier-3 technical and policy document to be released this week.
https://twiki.cern.ch/twiki/bin/view/Atlas/AtlasTier3
- min requirements (recommendation really): 25-50 cores, 10-50 TB, 0.1-1 Gbps, technical/physicist support
- No signed agreements/MOUs (unless in LHCONE). Site is officially an ATLAS T3 when ADC confirms the status, and ICB is informed on inclusion
- T3MON - [http://cdsweb.cern.ch/record/1333701][ATL-COM-SOFT-2011-005]]
- Currently 26 sites in 7 clouds (none in CA, mostly Europe and USA), 18 with Panda queues
- Comment: ATLAS computing model is quite rigid and oriented toward static T1/T2 sites. T3 configuration is non trivial.
- CA Cloud Squad Actions [20110322]
- DaTRI requests approved / processed (last week)
- TRIUMF-LCG2_LOCALGROUPDISK: 3 / 1 GB / 1 GB
- TRIUMF-LCG2-SCRATCHDISK: 0 / 0 GB / 0 GB
- Australia-ATLAS_LOCALGROUPDISK: 407 / 2600 / 2652 GB
- CA-ALBERTA-WESTGRID-T2_LOCALGROUPDISK: 0 / 0 / 0 GB
- CA-SCINET-T2_LOCALGROUPDISK: 0 / 0 / 0 GB
- CA-SCINET-T2_SCRATCHDISK: 0 / 0 / 0 GB
- CA-VICTORIA-WESTGRID-T2_LOCALGROUPDISK: 5 / 125 GB / 125 GB
- SFU-LCG2_LOCALGROUPDISK: 4 / 350 GB / 350 GB
- Declared Downtimes
- TRIUMF-LCG2/ SCHEDULED downtime (OUTAGE) [19-03-2011 15:00 to 20-03-2011 03:00 UTC ] - Power outage in the building of TRIUMF Tier 1 center
- ATLAS Site Exclusion Savannah entries [20110322]
- HammerCloud autoexclusions
- NONE * other cloud squad related savannah and / or ROC ggus tickets [20110322]
- !PD2P (dynamic data placement) in CA cloud
[20110322]
- panda monitor for PD2P activity within clouds (default view (last 7 days) units = datasets)
- Open Issues and Ongoing Discussions
- Sites should be providing the April 2011 storage pledge in one week [see 20110315 report.
- CREAM CE deployment preparations
- HammerCloud
- Updated HC tests for UVic to include dedicated 96 core (12 node) test: https://twiki.atlas-canada.ca/bin/view/AtlasCanada/CACloudJan2011 [20110315]
- Test being rerun for Alberta [20110315]
- HammerCloud tests of TRIUMF completed via panda to compare direct i/o via dcap, FileStager and full file copy
- HammerCloud tests of CA clouds sites is planned to be resumed soon to help measure site performance and identify any site setup bottlenecks [2010803]
- gLite News [20110322]
- [20110315] UPDATE 25 for gLite 3.2 - Priority HIGH Broadcast 334
- Highlights of the update are new versions of glite-BDII_site and glite-BDII_top
- ROC_Canada News [20110322]
- Current shift - Leslie Groer Mar 21-25
- Next Week - Neil Knecht Mar 28 - Apr 1
- Squid Deployment [20110322]
- CA cloud Frontier and Squid deployment information (versions and network information)
- SAM tests: (CA Link)
, (Aus Link)
: currently status as of this morning (WARN is ok) [20110322]
- CA-ALBERTA-WESTGRID-T2 OK (OK for local squid; OK backup to SFU)
- CA-SCINET-T2: (ce1) WARN (ce2) OK (both for local squid and backup to SFU)
- CA-VICTORIA-WESTGRID-T2 OK (OK for local squid; OK for backup to CA-ALBERTA-WESTGRID-T2)
- SFU-LCG2 OK (both CEs; both for local squid and backup to CA-VICTORIA-WESTGRID-T2)
- ATLAS_AUSTRALIA - OK (OK for local squid and backup to CA-VICTORIA-WESTGRID-T2)
- TRIUMF-LCG2 OK (ce1) OK (ce2) (local Frontier launchpad and BNL as backup)
- VICTORIA-LCG2 OK (OK for local squid and backup to CA-VICTORIA-WESTGRID-T2)
SAM Results
- site service status via Gridview
- Please check your site
- March 2011 Detailed Site Information (valid until 20110331):
- TRIUMF-LCG2
- Australia-ATLAS
- CA-ALBERTA-WESTGRID-T2
- CA-SCINET-T2
- CA-VICTORIA-WESTGRID-T2
- SFU-LCG2
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
- see gLite news above regarding the end-of-life with regards to glite-MON on SL4 and the migration to glite-APEL on SL5
APEL Publishing Status

APEL Accounting Results

APEL Synchronization Test Links
Site Reports
Alberta
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
Outstanding Issues
Victoria
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- see "Notes" section below
Outstanding Issues
- Occasionally some jobs fail to stage-in .gpg files via scp and have to be terminated. (20100928)
- 201102 - It seems that these jobs are meant to be cancelled, but the lcg-CE, as well as the Cream CE, fail to cancel them.
- 20110308 - The reason that the jobs were never cancelled successfully is a Torque incompatibility with the High Availability feature of Moab. qdel would fail whenever moab02 is the active server, if the full job id is used instead of the short job id. It's because the full job id ends with the address of the moab01 server and torque thinks it should therefore try to contact that server instead of the active one.
Toronto
Recent Issues
- [20110321] Main 10G SciNet to campus fibre route changed to new campus Cisco ASR9K gateway. No issues seen with routing on campus or to R&E or regular internet
- [20110322] BGP routing changed at TRIUMF to accept UofT Autonomous System number AS 239
- VLAN tagging at datacentre still needs to be reconfigured
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
Outstanding Issues
- [20110307] APEL publishing failing to update information. Auto-yum update of lcg-dgas-tools-1.0.0-2.sl4.i386 to lcg-dgas-tools.i386 1.0.0-4.slc4 on lcg-ce1 on Feb 17 broke the creation of grid-jobmap_YYYYMMDD records.
- Still issues on CE1 - APEL records updated by hand using gatekeeper information [20110315]
- [20110322] lcg-ce1 records are being scraped manually from /var/log/messages and gatekeeper information for the moment. lcg-ce1 needs to be reconfigured (YAIM) but will likely break things.
McGill
Recent Issues
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- see "Notes" section below
Outstanding Issues
- HammerCloud tests of TRIUMF completed via panda to compare direct i/o via dcap, FileStager and full file copy [20100827]
- PFC creation time and gaps under investigation following production errors [20100729]
- solved by subsequent PFC update but larger issue of PFC update timing needs attention
Australia-ATLAS
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
Outstanding Issues
Production
Summary
- NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.
- Within the CA Cloud and Worldwide (Panglia
View):



Time interval: 2011-03-15 18:00:00 to 2011-03-22 00:00:00
(finished/failed)
Worldwide Production by Cloud:
US (673292/45662)
DE (269590/22173)
FR (254053/30243)
UK (179144/22282)
ES (110590/10557)
CERN (109413/10393)
NL (102049/6521)
CA (72221/24633)
IT (66051/11811)
ND (68313/6584)
TW (58872/5503)
Production:
TRIUMF (14391/19607)
CA-SCINET-T2 (9649/131)
CA-VICTORIA-WESTGRID-T2 (3286/148)
SFU-LCG2 (2947/23)
CA-ALBERTA-WESTGRID-T2 (1949/5)
Australia-ATLAS (629/31)
Analysis:
ANALY_TRIUMF (12131/900)
ANALY_SCINET (11335/1005)
ANALY_ALBERTA-WG1 (4521/326)
ANALY_SFU (4456/312)
ANALY_SFU_bugaboo (2539/1726)
ANALY_AUSTRALIA (2499/273)
ANALY_VICTORIA-WG1 (1889/146)
Failed Jobs
- From Panda Monitor (last day)
You can find the meanings of the transform error codes on
this link.
- Highlight's of Yuri's notes: (Mar 15-22, 2011)
A) During the past week (Mar.15-21,2011) Panda production service
- completed 1,169,831 managed group, MC production, validation and reprocessing jobs
- average ~167,119 jobs per day
- failed 85,033 jobs
- average efficiency:
-- jobs - 93.2%
-- walltime - 96.4%
- active tasks from Panda-monitor: 836
-- distribution by cloud:
CA:33 CERN:14 DE:152 ES:34 FR:261 IT:23 ND:37 NL:30 TW:6 UK:96 US:150
B) - CA/TRIUMF downtime (CE,SE,SRM,BDII,FTS,Oracle DBS OUTAGE),Mar.19,20.
- new DB Release 14.5.1.3,14.7.1 subscription done, Mar.15,18.
- data11 T1-T1 DS transfer started, Mar.15.
- IT: T3s (3 sites) were added to the FT, Mar.15.
- CERN: migration of SLS monitoring for Site Services done, Mar.15.
- CERN: short DT for adding new DB schemes to ATONR,ATLR, Mar.15.
- new LCG 60b has been released, Mar.15.
- HI reprocessing campaign in progress:
-- reconstruction is ~85% done,
-- merging is ongoing,
-- more details in Sasha's talk at ADC weekly:
https://indico.cern.ch/conferenceDisplay.py?confId=131784
Sat Mar.19
- CA/TRIUMF-LCG2_MCTAPE huge backlog of staging requests.Elog 23369,23383.
Sun Mar. 20
+ CA/TRIUMF-LCG2 All FT f./DEST.:CONN.:SRM.After 1h of SD ended.GGUS 68797
verified:power outage was much longer than expected,services recovered.
--
LeslieGroer - 2011-03-22