Tier1 and Tier-2 Weekly Report 2009-05-05
General News
- draft March availability and reliability report issued
Reliability History
Reliability Availability Dec08 Jan09 Feb09
Toronto 34 % 15 % 41 % 97 % 67 %
Alberta 83 % 82 % 98 % 94 % 98 %
SFU 77 % 77 % 92 % 89 % 85 %
Victoria 91 % 89 % 95 % 93 % 96 %
- Hammercloud test 277 started today [2009-05-05] on CA sites (without Filestager)
- Advanced Notice: STEP09 exercise (May 25-31 Setup, June 1-14 Running)
- REMINDER #1: siteTests package should be installed by all site admins and exercised regularly (daily) to confirm site functions for ganga and pathena
- REMINDER #2: remaining Sites (Toronto) please provide dCache checksum information (csm info) for you pools
- From the dCache admin interface for each pool run the 'csm info' command and return the output to the list
SAM Results
* ops-availability-20090505.png:

* ops-reliability-20090505.png:
* atlas-availability-20090505.png:

* atlas-reliability-20090505.png:
APEL Accounting
APEL Publishing Status
* apel-gantt-20090505.png:
APEL Accounting Results
* apel-statistics-20090505.png:
Data Subscription Requests
Site Reports
Alberta
Recent Issues
- too many globus-job-mnnagers running causing problem with non-executing jobs backlogging queues starting around 2009-04-24 identified via GGUS ticket
- CE services restarted 2009-04-28 and correct operations resumed
- new T2 on Westgrid - UA cluster (storage + cpu) being commissioned
- connectivity of ATLAS service nodes to new network is complete as of [2009-04-16]
- awaiting confirmation of BGP configuration from TRIUMF T1 networking people before attempting any failover tests [20009-04-21]
- SAN storage volume mounting on dCache pool nodes resolved with vendor - configuration of multipath IO to be done with TRIUMF Tier-1 as reference
- torque/Moab installation is in place for the cluster
- general ldap issues being resolved
Outstanding Issues
- site currently failing ganga filestager tests with 14.2.25 and is blacklisted . This is under investigation (AdS) [2009-04-07]
- full decoupling of WLCG accounts from cluster NIS to be done (see problem reported 2009-04-14)
- pnfsd.log to be added to log-rotate [2009-03-31]
- few WNs to be debugged with respect to missing stderr/stdout
- still need to add 2nd Gigabit Ethernet nic to dCache pools for internal network access from WNs to avoid NAT
Recent Issues
- odd fairshare behavior observed comparing priority of atcan jobs versus atprd jobs when an overall share is provided to the single atlas group (atcan + atprd)
- to be discussed and investigated further
- several SE related errors over the weekend [2009-05-04]
- currently moving all SE files from old storage (gridstore) to new one across 1 GigE link of which is shared with general job access to the write pools
- some error levels expected but should still be reported
Outstanding Issues
Victoria
Recent Issues
- SE errors reported through failing test jobs and also affecting production jobs [2009-04-28]
- stale movers causing others to wait until timeout (for last month?); removed and problem resolved [2009-04-29]
- timeouts can be configured for movers
- APEL publishing status corrected and up-to-date (see above plot) ; missing statistics reported last meeting for April 09 [2009-04-21]
Outstanding Issues
Toronto
Recent Issues
- out of space for production releases reported [2009-04-29]
- deleted sl3 production releases (no longer needed) to clear up space [2009-04-30]
- downtime for dcache upgrade extended to [2009-04-28]
- site back in operation 2009-04-30 ; reentered into DDM for the functional tests over the weekend
- site set online by ADC oS shifters [2009-04-30] * some information services issues still to be resolved
Outstanding Issues
- new dCache almost complete but still to be fully debugged; target return date is end of this week [2009-04-24]
- srm space reservations failure being debugged
- scheduled maintenance downtime between 2009-03-25 and 2009-03-30 for ongoing dCache 1.9 and chimera upgrade
- failing SFT for job submission since 2009-03-10 with general SE problems since early March (GGUS ticket 46825)
- split head node with upgrade to chimera from PNFS ; scheduled downtimes followed
McGill
Recent Issues
Outstanding Issues
- attempts to restore the McGill site to up-and-running state have resumed [2009-03-25]
- pilots (without payload) successfully running
- next target is successful SAM tests
- SE functionality still to be tested on current dCache instance with two pools
Recent Issues
- Blades shutdown over the weekend because of cooling concerns.
- NFS software mount switched on Monday (4 May) and some jobs may have failed for this (may be flagged with errors such as release not installed / found.)
Outstanding Issues
Production
Summary
DashboardSummary.pdf
Failed Jobs
FailedJobs-05May09.pdf
Notes
- Not trivial to get information from Panda today - monitor not showing the failed job details.
- TRIUMF: Blades shutdown over the weekend because of cooling concerns. Also nfs software mount switched on Monday (4 May) and some jobs may have failed for this (may be flagged with errors such as release not installed / found.)
- A major part of the failures across all sites is the "Service Manager unable to Initialize service error" which I suspect is this GGUS ticket.
(48362)
- SFU has some SE errors (86 of the 449 failed jobs)
- TRIUMF had some SE failures (1148 of 2656 failed jobs) - last of which happened at 04-30 18:42 UTC.
- Victoria had SE errors as well (297 of 696 failed jobs) - last of which happened at 04-29 16:22 UTC.
--