Tier1 and Tier-2 Weekly Report 2009-03-03

Production

Summary

site success failure success (walltime) failure (walltime) efficiency efficiency (walltime)
TRIUMF-LCG2 25969 63 276814277 1342904 99.8% 99.5%
SFU-LCG2 6419 51 121898732 727880 99.2% 99.4%
TORONTO-LCG2 602 4026 35002259 1713087 13% 95.3%
VICTORIA-LCG2 2855 475 108756269 3315355 85.7% 97%
ALBERTA-LCG2 1621 380 38857921 418534 81% 98.9%
total 37466 4995 581329458 7517760 88.2% 98.7%

DashboardSummary.pdf

Failed Jobs

FailedJobs-03Mar09.pdf

Notes

-- AsokaDeSilva - 03 Mar 2009

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf DashboardSummary.pdf r1 manage 93.1 K 2009-03-03 - 18:39 AsokaDeSilva  
PDFpdf FailedJobs-03Mar09.pdf r1 manage 44.5 K 2009-03-03 - 18:39 AsokaDeSilva  
Topic revision: r1 - 2009-03-03 - AsokaDeSilva
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback