Tier-2 Weekly Report 2009-02-10
SAM Results
- ops-availability-20090210.png:
- ops-reliability-20090210.png:
- atlas-availability-20090210.png:
- atlas-reliability-20090210.png:
APEL Accounting Publishing Status
- apel-gant-20090210.png:
APEL Accounting Results
- apel-table-20090210.png:
General News
- 20090202 - backlog of panda jobs at T2s that are in a state of 'transfering' of their output to TRIUMF Tier1. Resolved 20090205 with new install of site services (at CERN) and cloud reactivated
- next round of distributed analysis challenge for CA cloud scheduled to commence 2009-02-10 at 09:00 PST (baseline and FileStager tests)
- draft January 2009 accounting statistics published; CA-East 87524 kSI2k-Hrs (98% of pledge); CA-West 173992 kSI2k-Hrs (130% of pledge)
Site Reports
Alberta
Outstanding and Recent Issues
- no real issues
- few WNs to be debugged with respect to missing stderr/stdout
- still need to add 2nd GigE nics to dCache pools for internal network access from WNs to avoid NAT
- installed and tested siteTests package [2009-02-07]
- testing HEPSPEC version of SpecCPU2006 on nodes for WestGrid-T2 preparations [2009-02-02]
- preliminary comparison of default SL47 (2.6.9-78.0.13.ELsmp) and up-to-date kernels (2.6.28.2) with 32-bit code test (64-bit OS)
- Machine = Dell PE1950 2 x 4-core Intel Xeon E5405 @ 2.00GHz, 16 GB memory
- kernel = 2.6.9-78.0.13.ELsmp: HEP-SPEC2006 score = 55.65
- kernel = 2.6.28.2 : HEP-SPEC2006 score = 55.86
Outstanding and Recent Issues
- Ganga jobs failing at SFU a large fraction of the time and outstanding since 2008-11-10 - under ongoing investigation (will likely see effects in DA stress tests as well)
- SFU analysis and production pilot logs empty starting 2009-02-05 coinciding with change to ldap authentication but was due to failing dcache door ; passwd auth restored temporarily
- hostcert expired for snowpatch [MON services host + torque/moab] [2009-02-05]
Victoria
Outstanding and Recent Issues
- firewall issue was blocking site apel statistics reporting since around mid-January; resolved [2009-02-03]
- A. Agarwal now away on holiday for several weeks; local admins keeping watch (and A. Agarwal remotely when possible)
Toronto
Outstanding and Recent Issues
- increased size of MCDISK to 9.09 TB since it was close to being full [2009-02-09]
- Occupied TB: 7.00741812728 Total TB:7.27595761418
Outstanding and Recent Issues
- CA/TRIUMF pilot put error copying output from WN to localSE - resolved [2009-02-10]
- FTS server upgrade [2009-02-05]
- new round of pre-stage tests started [2009-02-09]
Production
Summary
ProductionDashboard.pdf
Failed Jobs
ProductionFailedjobs-10Feb09.pdf
Notes
The numbers in the Summary page do not seem to match the Failed Jobs page for the Tier-2s; this could be because of the failed Transfer jobs which timed out after 2 weeks.
--
AsokaDeSilva - 10 Feb 2009