Tier-2 Weekly Report 2009-02-03

SAM Results

  • ops-availability-20090203.png:
    ops-availability-20090203.png

  • ops-reliability-20090203.png:
    ops-reliability-20090203.png

  • atlas-availability-20090203.png:
    atlas-availability-20090203.png

  • atlas-reliability-20090203.png:
    atlas-reliability-20090203.png

APEL Accounting Publishing Status

  • apel-gant-20090203.png:
    apel-gant-20090203.png

APEL Accounting Results

  • apel-table-20090203.png:
    apel-table-20090203.png

General News

Site Reports

Alberta

Outstanding and Recent Issues

  • site production essentially offline due to too many transferring status [2009-02-01]
  • increased PRODDISK from 1 to 1.5 TB [2009-02-02]
  • intermittent SRM(v2) errors reported during the last couple weeks as single occurrence failures during SAM tests.
  • corrected missing pilot logs on majority of WNs due to incorrect mount of lcg pool user directories [2009-02-02]
  • couple reported dcap and copy failures with no clear sign of cause [2009-01-23]

SFU

Outstanding and Recent Issues

  • SFU dcache errors [2009-01-27]
  • high load on dcache observed [2009-02-02]
  • increased MCDISK to 20 TB [2009-02-02]

Victoria

Outstanding and Recent Issues

  • failing 14.2.10 jobs at UVic [2009-01-28]
  • test job failures [2009-02-02]
  • increased MCDISK from 3 to 4 TB [2009-02-02]

Toronto

Outstanding and Recent Issues

  • test job failures [2009-02-02]
  • structure of the new site naming convention needed for new SCInet hardware registration [2009-02-01]

Production

Summary

site success failure success (walltime) failure (walltime) efficiency efficiency (walltime)
TRIUMF-LCG2 61427 345 328905479 8575880 99.4% 97.5%
SFU-LCG2 5213 243 55174032 3074537 95.5% 94.7%
VICTORIA-LCG2 1469 62 55872176 3113803 96% 94.7%
TORONTO-LCG2 1316 51 59705338 3923884 96.3% 93.8%
ALBERTA-LCG2 1220 67 15359963 1563781 94.8% 90.8%
total 70645 768 515016988 20251885 98.9% 96.2%

dashboard-summary.pdf

Failed Jobs

ProductionFailedJobs-03Feb09.pdf

Notes

-- BryanCaron - 03 Feb 2009

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf ProductionFailedJobs-03Feb09.pdf r1 manage 45.6 K 2009-02-03 - 18:05 AsokaDeSilva  
PNGpng apel-gant-20090203.png r1 manage 23.1 K 2009-02-03 - 18:18 BryanCaron  
PNGpng apel-table-20090203.png r1 manage 994.7 K 2009-02-03 - 18:19 BryanCaron  
PNGpng atlas-availability-20090203.png r1 manage 2503.2 K 2009-02-03 - 18:17 BryanCaron  
PNGpng atlas-reliability-20090203.png r1 manage 2344.4 K 2009-02-03 - 18:17 BryanCaron  
PDFpdf dashboard-summary.pdf r1 manage 92.6 K 2009-02-03 - 17:47 AsokaDeSilva  
PNGpng ops-availability-20090203.png r1 manage 2510.3 K 2009-02-03 - 18:16 BryanCaron  
PNGpng ops-reliability-20090203.png r1 manage 2364.6 K 2009-02-03 - 18:16 BryanCaron  
Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r4 - 2009-02-03 - BryanCaron
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback