Tier-2 Weekly Report 2009-01-13
SAM Results
- ops-availability-20090120.png:
- ops-reliability-20090120.png:
- atlas-availability-20090120.png:
- atlas-reliability-20090120.png:
APEL Accounting Publishing Status
- apel-gant-20090120.png:
APEL Accounting Results
- apel-table-20090120.png:
General News
- Site Test Package (A. de Silva)
- Tier1/2 face-to-face meeting at TRIUMF scheduled for January 26 (full day) and 27 (half day) agenda link
Site Reports
Alberta
Outstanding and Recent Issues
- scheduled downtime for Thursday January 15 for 6 hours starting at 08:00 MST due to interruption of chilled water service to HVAC unit in our computing centre
- long-latency observed on smokeping traffic from TRIUMF to Alberta router interface on e2e lightpath; rebooted switch (not affecting RTT to LCG services) [January 15]
- FTS channel between TRIUMF-Alberta problem reported last week via GGUS ticket - non-functioning for a few weeks now resolved; site in production test before full resumption of production jobs [January 20]
- similar to Victoria, the disk space issues as per settings in new panda update; resolved by update to Panda dBase [January 14]
- installing secondary site infrastructure using Xen for gLite updates deployment testing prior to moving any service changes into production
- Xen VMs running (4); new host certificates created; CE glite middleware installed so far only
- stderr/stdout direction with a handful of remaining WNs
- various gLite updates to CE, SE and MON pending (see above)
Outstanding and Recent Issues
- atcan (analysis) user jobs being queued non-starting ; resolved [January 14]
- stdout/stderr still on a few nodes even with proper ssh keys installed
- occasional SAM test failures due to queues being full since CE node removed from accepting SAM jobs
Victoria
Outstanding and Recent Issues
- SE gridmapfile update issues - missing DN for JSteele - manual update still required [January 6,7]
- automatic cross-check with CE grid-mapfile would be good to have in place
- caching of globus-job-run output seen (from December 15) - problem persisting [January 9]
- problem related to different source job submitter systems (one real the other a VM); resolved?
- Victoria disk space issues as per settings in new panda update[January 14]
- production exceeding queue limit of 2 days at site ; resolved [January 16]
- added a new pool node with 2TB pool ; operations seem ok [January 20]
Toronto
Outstanding and Recent Issues
- SE gridmapfile update issues - missing DN for JSteele - manual update still required [January 6,7]
- automatic cross-check with CE grid-mapfile would be good to have in place * Toronto queues issue [January 20]
- production exceeding queue limit of 2 days at site; still unresolved; Leslie made changes Jan20 [January 16]
Production
Summary
dashboard.pdf
Most of the failed jobs at Toronto and Victoria were because jobs were killed by the system when a wallclock time of 2 days was reached. Most of the failed Alberta jobs had a transfer timeout (2 weeks) error.
Failed Jobs
FailedJobs-20jan09.pdf
Notes
--
AsokaDeSilva - 20 Jan 2009