Tier-2 Weekly Report 2009-01-06

SAM Results

  • ops-availability-20090106.png:
    ops-availability-20090106.png

  • ops-reliability-20090106.png:
    ops-reliability-20090106.png

  • atlas-availability-20090106.png:
    atlas-availability-20090106.png

  • atlas-availability-20090106.png:
    atlas-availability-20090106.png

APEL Accounting Publishing Status

  • apel-gant-20090106.png:
    apel-gant-20090106.png

APEL Accounting Results

  • apel-table-20090106.png:
    apel-table-20090106.png

General News

  • Tier1/2 face-to-face meeting at TRIUMF scheduled for January 26 (full day) and 27 (half day)

Site Reports

Alberta

Outstanding and Recent Issues

  • most host certificates expired on January 1 or 2 ; request for new host certificates made to Grid Canada (processed on January 5); services restarted January 5 after adding scheduled downtime to GOCDB
  • updated lcg-CA to 1.26-1 (service nodes + WN-tarball installation)

  • installing secondary site infrastructure using vmware for gLite updates deployment testing prior to moving any service changes into production
    • Xen VMs running (4); new host certificates created; glite middleware to be installed
  • stderr/stdout direction with a handful of remaining WNs
  • various gLite updates to CE, SE and MON pending (see above)

SFU

Outstanding and Recent Issues

Victoria

Outstanding and Recent Issues

Toronto

Outstanding and Recent Issues

Production

The summaries only seem to display results for TRIUMF and Alberta; I am not sure if this was because production ran only at these two sites.

Summary

site success failure success (walltime) failure (walltime) efficiency efficiency (walltime)
TRIUMF-LCG2 5814 3081 185492127 115055398 65.4% 61.7%
ALBERTA-LCG2 0 140 0 5105455 0% 0%
total 5814 3221 185492127 120160853 64.3% 60.7%

dashboard-summary.pdf

Failed Jobs

ProductionFailedJobs-06Jan09.pdf

Notes

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf ProductionFailedJobs-06Jan09.pdf r2 r1 manage 44.3 K 2009-01-06 - 20:07 AsokaDeSilva  
PNGpng apel-gant-20090106.png r1 manage 22.8 K 2009-01-06 - 19:03 BryanCaron  
PNGpng apel-table-20090106.png r1 manage 971.6 K 2009-01-06 - 19:00 BryanCaron  
PNGpng atlas-availability-20090106.png r1 manage 2638.6 K 2009-01-06 - 19:02 BryanCaron  
PDFpdf dashboard-summary.pdf r1 manage 89.5 K 2009-01-06 - 19:54 AsokaDeSilva  
PNGpng ops-availability-20090106.png r1 manage 2655.7 K 2009-01-06 - 19:00 BryanCaron  
PNGpng ops-reliability-20090106.png r1 manage 2600.1 K 2009-01-06 - 19:01 BryanCaron  
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2009-01-06 - AsokaDeSilva
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback