Tier-2 Weekly Report 2008-12-02

SAM Results

  • availability-ops-20081202.png:
    availability-ops-20081202.png

  • reliability-ops-20081202.png:
    reliability-ops-20081202.png

  • availability-atlas-20081202.png:
    availability-atlas-20081202.png

  • reliability-atlas-20081202.png:
    reliability-atlas-20081202.png

APEL Accounting Publishing Status

  • apel-gant-20081202.png:
    apel-gant-20081202.png

APEL Accounting Results

  • apel-chart-20081202.png:
    apel-chart-20081202.png

General News

  • Connectivity to CERN issues [2008-11-26/27]
    • infrastructure problems with USLHCnet with whom CANARIE peers; resulted in varying levels of packet loss and therefore failed SAM tests for T2s
    • resolved 2008-11-28

  • Distributed Analysis Challenges
    • preparations ongoing; targetting Wednesday 2008-12-03 for challenge tests in CA cloud
    • DA challenge twiki page created by A. de Silva with link to mini-exercise tests results from the DA team

  • PRODDISK space token to be increased *sites should increase the size of their PRODDISK space token (reservation) in dcache to ~ 1 TB. This is needed to accommodate an increased size requirement for the weekly functional tests run by ADC operations

Site Reports

Alberta

Outstanding and Recent Issues

  • failed SAM tests and alarms coincident with network connectivity troubles to CERN - CERN ROC created ticket to site
  • created unscheduled downtime in GOCDB to account for SAM problems - [2007-11-27 to 2007-11-29]
  • corrected site published information in BDII to correctly refect membership in CERN ROC [2008-12-02]
  • long running pilot jobs (> 48 hours) from general user type production blocking all regular panda job slots; thus failing ganga robots (unexecuted) and non-running Asoka tests [2008-12-02]
  • restarted APEL parser and publisher to update site statistics to the end of November - should appear shortly on APEL statistics pages [2008-12-02]

  • installing secondary site infrastructure using vmware for gLite updates deployment testing prior to moving any service changes into production
  • stderr/stdout direction with a handful of remaining WNs
  • various gLite updates to CE, SE and MON pending (see above)

SFU

Outstanding and Recent Issues

  • similar SAM test results during period of network connectivity troubles to CERN [2008-11-26/27]
  • added new pool to increase MCDISK to 15 TB [2008-11-25]
  • SFU panda production queue offline [2008-11-26] - reason?
  • job failures reported [2008-11-27] - hardware failure on s4?
  • activated but no running pilots/jobs [2008-11-28]
  • ggus ticket re: acl problem in SFU dcache [2008-11-29]
  • job failures reported [2008-12-02]

Victoria

Outstanding and Recent Issues

  • SAM test failures as per the rest of the sites during network difficulties
  • /atlas/ca group mappings incorrect to be resolved
  • missing valid proxy reported [2008-11-29]
  • apel accounting statistics investigation - why are they so low? cronjob error is believed to be the reason. [2008-11-28]
  • release 14.2.24 installation check - missing tag?

Toronto

Outstanding and Recent Issues

  • SAM test failures as per the rest of the sites
  • missing valid proxy reported [2008-11-29]
  • restarted dcache [2008-11-26]

Production

Summary

site success failure success (walltime) failure (walltime) efficiency efficiency (walltime)
TRIUMF-LCG2 11942 293 58886001 3255733 97.6% 94.8%
SFU-LCG2 2517 307 12852583 448289 89.1% 96.6%
TORONTO-LCG2 1274 485 20876782 10640844 72.4% 66.2%
ALBERTA-LCG2 931 231 5952546 647915 80.1% 90.2%
VICTORIA-LCG2 922 65 9061391 4996944 93.4% 64.5%
total 17586 1381 107629303 19989725 92.7% 84.3%

dashboard_summary.pdf

Failed Jobs

ProductionFailedJobs-02Dec08.pdf

Notes

-- AsokaDeSilva - 02 Dec 2008

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf ProductionFailedJobs-02Dec08.pdf r1 manage 50.9 K 2008-12-02 - 19:35 AsokaDeSilva  
PNGpng apel-chart-20081202.png r1 manage 799.3 K 2008-12-02 - 19:57 BryanCaron  
PNGpng apel-gant-20081202.png r1 manage 22.3 K 2008-12-02 - 19:57 BryanCaron  
PNGpng availability-atlas-20081202.png r1 manage 2404.2 K 2008-12-02 - 19:56 BryanCaron  
PNGpng availability-ops-20081202.png r1 manage 2412.4 K 2008-12-02 - 19:56 BryanCaron  
PDFpdf dashboard_summary.pdf r1 manage 92.7 K 2008-12-02 - 19:24 AsokaDeSilva  
PNGpng reliability-atlas-20081202.png r1 manage 2283.3 K 2008-12-02 - 19:56 BryanCaron  
PNGpng reliability-ops-20081202.png r1 manage 2274.5 K 2008-12-02 - 19:56 BryanCaron  
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2008-12-02 - BryanCaron
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback