ITk


INTRODUCTION

This TWiki page collects the joint group activities of SFU, TRIUMF and UBC on the ATLAS Inner Tracker (ITk).

CLEANROOM

Work at TRIUMF centres around our class 1000 cleanroom in the MHESA building, L1. <!-- <p>Occupancy calendar -- please fill in in advance when you intend to go in the cleanroom:<span class="WYSIWYG_HIDDENWHITESPACE" style="{encoded: 'n'};"> </span><a href="https://docs.google.com/spreadsheets/d/1DJ0-cPHJEV-gFzgnMxwy_3oYXjkcBFxtcgx-zKlqz8Y" class="TMLlink">Calendar</a></p> -->

Entry procedure:

  • Enter via the boot up room (not via the corridor), stepping a few times with each foot on the blue sticky mat
  • Put on a hair net
  • If you have a beard, put on a beard net
  • Put on an over-coat (visitors: please pick one without a name on)
  • Put on blue overshoes and step over the barrier. The black strip must be on the outside, under your foot; the loose end must be pushed inside your shoe so that it grounds you
  • Stand on the ESD tester and push the test button. If it fails, clean your ESD shoe soles, or rearrange the black ribbon on blue overshos until you do pass the test
  • Step a few times with each foot on the blue sticky mat before entering the cleanroom
  • Clean any equipment you are bringing in by wiping with the cloths and solvents provided.

Departure: Put hair net, beard net, and over-shoes in the bin. Put over-coats back in the coat rack.

Contact: Phone number 6580, Grey room phone no. 6581

Monitoring: Grafana Monitor web-page. Manual for clean-room conditions monitoring: CleanroomMonitor.pdf.

Manuals:

ELog: Please use our Electronic Logbook to record events (such as power out, HVAC problems, changes, ...). Anything that in the future we will be glad of.

Printing: There is an HP OfficeJet Pro 8720 in the gowning room. It can be accessed as clas22 on the TRIUMF network.

Disk Storage: We have a large storage disk available for backups, photos etc. It can be reached from inside the TRUMF firewall at http://itk-van-triumf.triumf.ca:5000/ or ssh itk-user@itk-van-triumf.triumf.ca

Cleaning:

  • Cleaning schedule 2021/22: Twice per month on Fridays at 5 pm. Details: cleanroomCleaningSchedule21-22.xlsx
  • Please make way for the cleaner if you are working late on a Friday.
  • To get waste bins emptied, simply put them on the dirty side of the change barrier as you leave. Bring emptied bins back in when you return.
  • We are responsible for cleaning our own benches. Sergey has set up a list of who does what. Use the hepa-filter vacuum cleaner with the round long-haired head to avoid spreading dust, or wipe with cloths carefully.

ACTIVITIES

Weighing balance:

There are 2 weighing balances - (a) Sartorius, and (b) Scout. Calibration has been carried out for Scout, taking Sartorius as reference. It is found that for weights measured on Scout - True weight = Weight measured/1.0015. For details, please see WeighingBalance.docx.

Coordinate Measuring Machine (CMM):

Please find the documentation on CMM.docx.

Dry storage cabinet

We need to keep sensors very dry. Storage cabinet spec is that it should return to less than 10 % relative humidity within an hour of opening a door.

To minimise the exposure time to humidity, and meet the spec, please pay attention to the following:

  1. Minimise the time the door is open: please plan ahead, open only the correct door, have everything ready before opening it, and close it as soon as possible.
  2. After opening a door, turn the dry air flow up high: fully open the control valve, so the ball is off-scale. This gives 10 times the indicated flow on the top of the scale.
  3. After 30 min, dry level will be restored. Reduce flow to 15 bar l/min.

Note that in the event of humidity rising above 10 % for over 24 hours (or suspicion that has occurred) we should add a note in the data base for each item stored that this has happened (see "Storage Requirements - Hybrids, Power Boards and Modules", EDMS 2520892)

Module assembly

Module Building Schedule

Hybrids

Wire bonding

  • Instructions on how to use the wire bonding machine have disappeared. (The links were: here, Videos of the Delvotec training course from end of 2017 were available at Cernbox, Videos of training at Delvotec, CA, were available at Cernbox)
  • See instead the Delvotec manuals, or ask Bernd if he knows of a copy.
Wire pull tester Modules

DAQ

Petals

Module on Core Loading

SOP: PetalAssembly.pdf

Petal Test System

Overview of petal test system: PetalTestSystem.pdf

MARTA filling instructions: fillMARTA.pdf

PURCHASES

Purchase Item   Budget code in Workday
Consumables, maintenance, running the cleanroom Project task PRJ_414 ... SUPPLY IOF
Consumables, maintenance, running the cleanroom (when above budget runs out) Project Task PRJ_401 ... SUPPLY IOF
ATLAS ITk Equipment Project Task PRJ_401 ... EQUIP CFI #3
ATLAS ITk Module parts and tools Project Task PRJ_401 ... Parts CFI #2
TRIUMF Team - computers, stationary, etc. Grant GR_475

VISITOR/NEWCOMER TRAINING

Visitor/Newcomer should be trained and oriented for basic safety. A tick sheet is available in the Visitor/newcomer training manual. You are recommended to print it, tick off the boxes, sign and date it.

TEAM

  • Alison Lister - UBC - professor
  • Luise Poley - TRIUMF - postdoc
  • Bernd Stelzer - SFU - professor
  • Graham Greig - SFU Consultant
  • Nigel Hessey - TRIUMF - research scientist
  • Scott Beaupre - SFU - physics engineer
  • Peter Speers - SFU Technician
  • Sebastian Manson - TRIUMF - Technician
  • Allen Tigchelaar - Technician

LINKS

Topic attachments
I Attachment History Action Size Date Who Comment
Microsoft Word filedocx CMM.docx r1 manage 2835.4 K 2021-11-23 - 22:30 GeetikaJain  
PDFpdf CMM_JobPerformanceMeasures.pdf r1 manage 60.3 K 2021-07-13 - 16:53 NigelHessey CMM Job Performance Measures
PDFpdf Calibration.pdf r1 manage 201.2 K 2021-11-10 - 22:11 GeetikaJain  
PDFpdf CleanroomManual.pdf r5 r4 r3 r2 r1 manage 8994.8 K 2021-09-28 - 19:37 NigelHessey Cleanroom operations manual
PDFpdf CleanroomMonitor.pdf r3 r2 r1 manage 741.7 K 2024-04-03 - 23:00 NigelHessey Manual for clean-room conditions monitoring.
PDFpdf CleanroomTraining.pdf r1 manage 73.9 K 2021-07-13 - 21:58 NigelHessey Training manual for visitors
PDFpdf Delvotec_JobPerformanceMeasures.pdf r1 manage 59.6 K 2021-07-13 - 16:53 NigelHessey Wire Bonder Job Performance Measures
PDFpdf Gantry_JobPerformanceMeasures.pdf r1 manage 59.1 K 2021-07-13 - 16:53 NigelHessey Gantry Job Performance Measures
PDFpdf MHESA_L1Cleanroom.pdf r4 r3 r2 r1 manage 3358.5 K 2022-03-28 - 18:03 NigelHessey Cleanroom description
PDFpdf Manual-AirMonitor.pdf r1 manage 146.0 K 2019-12-20 - 19:19 NigelHessey Joey Lindon guide to the air monitor.
PDFpdf PetalAssembly.pdf r1 manage 110.9 K 2023-02-07 - 00:56 NigelHessey Version D
PDFpdf PetalTestSystem.pdf r1 manage 77.4 K 2021-02-04 - 04:14 NigelHessey Overview of Petal Test System components
Microsoft Word filedocx PurchasesThroughWorkday.docx r1 manage 16.1 K 2021-11-23 - 22:31 GeetikaJain  
Microsoft Word filedocx WeighingBalance.docx r1 manage 51.0 K 2021-11-23 - 22:29 GeetikaJain  
Microsoft Excel Spreadsheetxlsx cleanroomCleaningSchedule21-22.xlsx r1 manage 5.5 K 2021-11-03 - 23:15 NigelHessey Cleaning schedule 2021-22
PDFpdf fillMARTA.pdf r1 manage 222.8 K 2021-02-04 - 04:15 NigelHessey Instructions for CO2 cooling system operations
PDFpdf gmx2geo.pdf r1 manage 155.4 K 2016-11-25 - 18:02 NigelHessey GeoModelXml manual
PDFpdf stripDev.pdf r2 r1 manage 321.3 K 2016-12-01 - 23:27 NigelHessey  
Edit | Attach | Watch | Print version | History: r45 < r44 < r43 < r42 < r41 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r45 - 2024-04-03 - NigelHessey
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback